| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| New Campus Chiller Plant Construction (Design, Engineering, Project Management) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Chillers (Large Capacity, Water-Cooled or Air-Cooled) | 3 | each | $1,500,000.00 | $4,500,000.00 | Construction |
| Cooling Towers | 3 | each | $300,000.00 | $900,000.00 | Construction |
| Pumps (Chilled Water, Condenser Water) | 6 | each | $75,000.00 | $450,000.00 | Construction |
| Piping and Valves (Chilled Water, Condenser Water, Make-up Water) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Electrical Infrastructure (Switchgear, Transformers, Wiring, Controls) | 1 | lot | $1,800,000.00 | $1,800,000.00 | Construction |
| Building Management System (BMS) Integration and Controls | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Structural Steel and Concrete Work for Chiller Plant Building | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| HVAC Systems for Chiller Plant Building (Ventilation, Heating) | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Fire Protection System (Sprinklers, Alarms) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Site Work (Excavation, Grading, Utilities, Landscaping) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Insulation (Piping, Equipment) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Testing, Adjusting, and Balancing (TAB) Services | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Commissioning Services | 1 | lot | $500,000.00 | $500,000.00 | Professional Services |
| Contingency and Project Overhead | 1 | lot | $5,000,000.00 | $5,000,000.00 | Other |
| Estimated Bid Value | $25,000,000.00 | ||||