Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility)

Estimated Value: $3,500,000,000
Open 171 days left OhioEnergy & Utilitiesother
Jun 23, 2026
Dec 23, 2026 12:00 AM
Energy & Utilities
other
541715
AI Summary
This bid is for the design, construction, and commissioning of an Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility) primarily for large-scale tritium production for fusion energy applications.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility) Design and Engineering 1 lot $500,000,000.00 $500,000,000.00 Professional Services
Accelerator System (High-Power Proton Accelerator) 1 each $750,000,000.00 $750,000,000.00 Energy
Sub-Critical Molten-Salt Reactor Core and Associated Systems 1 each $1,000,000,000.00 $1,000,000,000.00 Energy
Tritium Extraction and Processing Plant 1 each $300,000,000.00 $300,000,000.00 Energy
Balance of Plant (BOP) Systems (e.g., cooling, power distribution, safety systems) 1 lot $400,000,000.00 $400,000,000.00 Energy
Facility Construction and Infrastructure (buildings, shielding, utilities) 1 lot $300,000,000.00 $300,000,000.00 Construction
Instrumentation and Control Systems (I&C) 1 lot $150,000,000.00 $150,000,000.00 IT Hardware
Safety Analysis and Licensing Support 1 lot $100,000,000.00 $100,000,000.00 Professional Services
Estimated Bid Value$3,500,000,000.00

Want the full details?

Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.

📎 Capability-Snapshot-ADSMSA-26-25142.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in OhioEnergy & Utilities BidsClosing Soon All Bids