AI Summary
This bid is for construction services to replace an existing hydraulic bollard system, including 27 hydraulic bollards and all associated equipment and controls, outside the East building's three-bay loading dock at a DOT HQ facility.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-Bid-Build Construction Services for Hydraulic Bollard System Replacement 1 lot $250,000.00 $250,000.00 Construction
Hydraulic Bollards (Heavy-Duty, Crash-Rated) 27 each $25,000.00 $675,000.00 Security
Hydraulic Power Units (HPUs) and Associated Pumping Equipment 3 each $30,000.00 $90,000.00 Security
Bollard Control System (PLC-based, integrated) 1 lot $75,000.00 $75,000.00 Security
Underground Hydraulic Lines and Electrical Conduit/Wiring 1 lot $80,000.00 $80,000.00 Construction
Site Preparation, Excavation, Concrete Work, and Restoration 1 lot $80,000.00 $80,000.00 Construction
Estimated Bid Value$1,250,000.00

Want the full details?

Sign up free to see contact info, and the original bid posting link.

Sign Up Free →

Related Bids

Browse More Bids

Construction BidsRFP BidsClosing Soon All Bids