CUP Generator Controller Replacements

Open 15 days left CaliforniaConstructionrfq
Jun 25, 2026
Jul 20, 2026 12:00 AM
Construction
rfq
238210
AI Summary
This bid is for the replacement of CUP Generator Controllers at UC Davis Medical Center. The solicitation type is Design Bid-Build, meaning the selected contractor will be responsible for both the design and construction aspects of the project. To win, bidders will need to submit a proposal by the due date of July 20, 2026, outlining their approach to replacing these controllers.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
CUP Generator Controller Replacements 1 project Electrical Equipment & Components

Want the full details?

Sign up free to see the agency name, 5 documents, contact info, and the original bid posting link.

📎 prequal-ad-cupx-bp12-rev2.pdf View
📎 06-LF-C01-AdvertisementforBids(05-04-2026).pdf View
📎 joc-advertisement-prequalifications.pdf View
+2 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in CaliforniaConstruction BidsRFQ BidsClosing Soon All Bids