| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Pool Replacement (including demolition, excavation, new pool structure, plumbing, filtration, finishes, and associated site work) | 1 | lot | $450,000.00 | $450,000.00 | Construction |
| HVAC System Replacement (including demolition of existing system, installation of new HVAC units, ductwork, controls, electrical connections, and associated work) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Labor (skilled and unskilled for pool and HVAC replacement) | 1 | lot | — | — | Construction |
| Materials (for pool and HVAC replacement) | 1 | lot | — | — | Construction |
| Equipment (heavy machinery, tools, etc. for pool and HVAC replacement) | 1 | lot | — | — | Construction |
| Qualified Supervision (project management and oversight) | 1 | lot | — | — | Professional Services |
| Estimated Bid Value | $750,000.00 | ||||
Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.