U.S. Coast Guard Station Quillayute River Main Building Flooring Renovation

Estimated Value: $15,000
Open 20 days left WashingtonConstructionrfp
Jul 1, 2026
Jul 24, 2026 10:00 PM
Construction
rfp
238330
AI Summary
This bid is for the U.S. Coast Guard to renovate the flooring in the main building of Station Quillayute River, including the removal and disposal of existing flooring materials.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Labor for flooring removal and disposal 1 lot $5,000.00 $5,000.00 Construction
Equipment for flooring removal and disposal 1 lot $2,000.00 $2,000.00 Construction
Material for flooring removal and disposal (e.g., disposal bags, protective gear) 1 lot $1,000.00 $1,000.00 Construction
Transportation for equipment and waste disposal 1 lot $1,500.00 $1,500.00 Construction
Supervision for flooring removal and disposal 1 lot $2,500.00 $2,500.00 Construction
Disposal services for old flooring materials 1 lot $3,000.00 $3,000.00 Facilities
Estimated Bid Value$15,000.00

Want the full details?

Sign up free to see the agency name, 6 documents, contact info, and the original bid posting link.

📎 Station_Quillayute_River_Main_Building_Flooring_SOW_70Z03326Q2019000007.pdf View
📎 SF1449_70Z03326Q2019000007.pdf View
📎 SCWD_2015-5545_-_CLALLAM_WA__5_13_2026_.pdf View
+3 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in WashingtonConstruction BidsRFP BidsClosing Soon All Bids