| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Draw down water levels | 1 | job | — | — | Dam Rehabilitation |
| Clear and grub | 1 | job | — | — | Site Preparation |
| Excavate and remove existing overflow conduit and appurtenances | 1 | job | — | — | Dam Rehabilitation |
| Repair spillway erosion with riprap | 1 | job | — | — | Dam Rehabilitation |
Sign up free to see the agency name, 2 documents, contact info, and the original bid posting link.