| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Prep and repaint existing road gates and tie-back posts | 2 | each | $2,500.00 | $5,000.00 | Construction |
| Install new road gates with tie-back posts | 2 | each | $7,500.00 | $15,000.00 | Construction |
| Remove and replace wooden guardrail | 806 | linear foot | $100.00 | $80,600.00 | Construction |
| Mobilization and Demobilization (for entire project) | 1 | lot | $4,900.00 | $4,900.00 | Construction |
| Estimated Bid Value | $105,500.00 | ||||
Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.