Road Gate Painting, Road Gate Installation, Removal and Replacement of Guardrails, Buffumville Lake, Charlton, MA

Estimated Value: $105,500
Open 12 days left MassachusettsConstructionsolicitation
Jul 2, 2026
Jul 16, 2026 9:00 PM
Construction
solicitation
237310
AI Summary
This bid is for road gate painting, installation, and guardrail removal and replacement at Buffumville Lake in Charlton, MA. The work involves prepping and repainting two existing gates, installing two new road gates, and removing and replacing approximately 806 feet of wooden guardrail. To win, bidders must furnish all necessary materials and equipment to complete these tasks.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Prep and repaint existing road gates and tie-back posts 2 each $2,500.00 $5,000.00 Construction
Install new road gates with tie-back posts 2 each $7,500.00 $15,000.00 Construction
Remove and replace wooden guardrail 806 linear foot $100.00 $80,600.00 Construction
Mobilization and Demobilization (for entire project) 1 lot $4,900.00 $4,900.00 Construction
Estimated Bid Value$105,500.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 Solicitation_W912WJ26QA124.pdf View
📎 Attachments.pdf View
📎 Solicitation_Survey_26QA124.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in MassachusettsConstruction BidsSOLICITATION BidsClosing Soon All Bids