| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Temporary two-lane traffic bridge construction | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Detour construction | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Existing bridge removal | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Riprap scour protection installation | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| New two-lane bridge construction | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Stone masonry work | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Geotechnical work (e.g., surveys, analysis, foundation prep) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Estimated Bid Value | $7,500,000.00 | ||||