| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition of existing interior structures and finishes | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| New interior wall construction (framing, drywall, finishing) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| New flooring installation (e.g., vinyl composite tile, sealed concrete) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| New ceiling installation (e.g., acoustical ceiling tiles) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| HVAC modifications/installation for new layout | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Electrical system modifications/installation (lighting, outlets, data drops) | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Plumbing installation for drug testing facilities (sinks, toilets, specialized fixtures) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| New doors and frames installation | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Painting and finishing of new and modified surfaces | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| General contractor project management and oversight | 1 | lot | $32,000.00 | $32,000.00 | Professional Services |
| Estimated Bid Value | $250,000.00 | ||||
Sign up free to see the agency name, 5 documents, contact info, and the original bid posting link.