WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT

Estimated Value: $22,500
Closing Soon 2 days left Washington DCConstructionsolicitation
Jul 31, 2026
Sep 5, 2026 9:00 AM
Construction
solicitation
811
AI Summary
This bid is for the replacement of a faulty Programmable Logic Controller (PLC) at the U.S. Embassy in Bujumbura, Burundi, specifically for its Domestic Water Treatment Plant, and to integrate BACnet communication for connectivity with the Building Automation System.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Programmable Logic Controller (PLC) for Domestic Water Treatment Plant 1 each $7,500.00 $7,500.00 Construction
BACnet Communication Module/Integration for PLC 1 each $2,500.00 $2,500.00 Construction
Installation and Configuration Services for PLC and BACnet Integration 1 lot $10,000.00 $10,000.00 Construction
Commissioning and Testing Services for DWTP PLC System 1 lot $2,500.00 $2,500.00 Construction
Estimated Bid Value$22,500.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 Amendment_No1_Questions_tobe_posted.pdf View
📎 SOW_-_NEC_DWTP_FAULTY_PLC_REPLACEMENT_2026_-_V3.pdf View
📎 19BY7026Q0010_StatementOfWork.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in Washington DCConstruction BidsSOLICITATION BidsClosing Soon All Bids