| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Chilled water piping installation (main line from Building 31 to Buildings 42/43) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Connection and integration of chilled water system to Building 42 HVAC | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Connection and integration of chilled water system to Building 43 HVAC | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Bypass valving and controls for existing chillers in Building 42 and 43 | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Engineering and design services for chilled water extension | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Estimated Bid Value | $450,000.00 | ||||
Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.