DOT HQ Replacement Moveable Bollards

Estimated Value: $700,000
Closing Soon 5 days left Constructionrfp
Aug 18, 2026
Sep 9, 2026 3:00 PM
Construction
rfp
236220
AI Summary
This bid is for construction services to replace an existing hydraulic bollard system, including 27 hydraulic bollards and all associated equipment and controls, outside the East building three-bay loading dock at the DOT HQ.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-bid-build construction services for hydraulic bollard system replacement 1 lot $200,000.00 $200,000.00 Construction
Hydraulic bollard (heavy-duty, crash-rated) 27 each $15,000.00 $405,000.00 Construction
Associated equipment and controls for hydraulic bollard system (e.g., hydraulic power units, control panels, sensors, wiring, conduit, trenching, drainage) 1 lot $95,000.00 $95,000.00 Construction
Estimated Bid Value$700,000.00

Want the full details?

Sign up free to see contact info, and the original bid posting link.

Sign Up Free →

Related Bids

Browse More Bids

Construction BidsRFP BidsClosing Soon All Bids