Y--Grand Coulee Dam, Industrial Area Compressed Air Upgrades, Columbia Basin Proje

Estimated Value: $1,500,000
Open 22 days left IdahoConstructionrfi
Aug 24, 2026
Sep 25, 2026 7:00 PM
Construction
rfi
236210
AI Summary
This bid is for construction services to upgrade the compressed air system in the industrial area of the Grand Coulee Dam, part of the Columbia Basin Project in Washington.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Compressed Air System Upgrades (Overall Project) 1 lot $1,500,000.00 $1,500,000.00 Construction
New Air Compressors (Industrial Grade) 2 each $150,000.00 $300,000.00 Construction
Air Dryers (Refrigerated/Desiccant) 2 each $50,000.00 $100,000.00 Construction
Air Receivers/Storage Tanks 2 each $25,000.00 $50,000.00 Construction
Piping and Distribution System Installation 1 lot $400,000.00 $400,000.00 Construction
Electrical Power Upgrades and Wiring 1 lot $200,000.00 $200,000.00 Construction
Control Systems and Instrumentation 1 lot $150,000.00 $150,000.00 Construction
Demolition and Site Preparation 1 lot $100,000.00 $100,000.00 Construction
Engineering and Project Management Services 1 lot $200,000.00 $200,000.00 Professional Services
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name, 2 documents, contact info, and the original bid posting link.

📎 SPEC_DRAFT_SS_Compressed_Air_Upgrades_Redacted_1.pdf View
📎 B01_08_-_Sources_Sought__GC_AIR_COMP__1.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in IdahoConstruction BidsRFI BidsClosing Soon All Bids