| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Corrugated Metal Pipe (CMP) Culverts, various diameters and lengths | 50 | linear foot | $50.00 | $2,500.00 | Construction |
| High-Density Polyethylene (HDPE) Culverts, various diameters and lengths | 75 | linear foot | $40.00 | $3,000.00 | Construction |
| Reinforced Concrete Pipe (RCP) Culverts, various diameters and lengths | 30 | linear foot | $100.00 | $3,000.00 | Construction |
| Culvert End Sections (various materials and sizes) | 20 | each | $300.00 | $6,000.00 | Construction |
| Culvert Bands/Couplings (various materials and sizes) | 100 | each | $50.00 | $5,000.00 | Construction |
| Delivery of Culvert Materials to Gifford Pinchot Project Site | 1 | lot | $5,000.00 | $5,000.00 | Transportation |
| Miscellaneous Culvert Accessories (e.g., grates, risers, geotextile fabric) | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Estimated Bid Value | $150,000.00 | ||||
Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.