H--FOBU-INSTALL FIRE SUPPRESSION SYSTEM

Estimated Value: $750,000
Open 11 days left WyomingConstructionother
Aug 31, 2026
Sep 14, 2026 7:00 PM
Construction
other
236220
AI Summary
This bid is for water system improvements at Fossil Butte National Monument to upgrade the existing infrastructure to meet current fire protection requirements, likely involving the installation or enhancement of a fire suppression system.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design and Engineering Services for Water System Improvements and Fire Suppression System 1 lot $75,000.00 $75,000.00 Professional Services
Excavation and Trenching for Water Main Installation 1 lot $50,000.00 $50,000.00 Construction
Installation of New Water Mains and Distribution Piping (various sizes) 1 lot $200,000.00 $200,000.00 Construction
Installation of Fire Hydrants 5 each $7,000.00 $35,000.00 Construction
Installation of Fire Department Connections (FDC) 2 each $3,000.00 $6,000.00 Construction
Installation of Backflow Prevention Devices 2 each $4,000.00 $8,000.00 Construction
Installation of Water Storage Tank (if required for fire flow) 1 each $150,000.00 $150,000.00 Construction
Installation of Fire Pump System (if required for pressure) 1 each $80,000.00 $80,000.00 Construction
Testing, Commissioning, and Certification of Fire Suppression System 1 lot $25,000.00 $25,000.00 Construction
Site Restoration and Landscaping 1 lot $30,000.00 $30,000.00 Construction
Project Management and Supervision 1 lot $91,000.00 $91,000.00 Professional Services
Estimated Bid Value$750,000.00

Want the full details?

Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.

📎 Sources_Sought_1.docx View
Sign Up Free →

Related Bids

Browse More Bids

Bids in WyomingConstruction BidsClosing Soon All Bids