| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Sewer Lift Station Pumps (Submersible, Duplex System) | 2 | each | $15,000.00 | $30,000.00 | Construction |
| Lift Station Control Panel (NEMA 4X, PLC-based) | 1 | each | $10,000.00 | $10,000.00 | Construction |
| Level Sensors/Float Switches | 3 | each | $500.00 | $1,500.00 | Construction |
| Guide Rails and Mounting Hardware for Pumps | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Discharge Piping, Valves, and Fittings (Stainless Steel/Ductile Iron) | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Electrical Conduit, Wiring, and Connections | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Installation Labor for Pumps and Controls | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Startup, Testing, and Commissioning Services | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Project Management and Supervision | 1 | lot | $8,000.00 | $8,000.00 | Professional Services |
| Permitting and Regulatory Compliance | 1 | lot | $3,000.00 | $3,000.00 | Professional Services |
| Site Preparation and Restoration (Excavation, Backfill, Grading) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Training for Operations Personnel | 1 | lot | $2,000.00 | $2,000.00 | Professional Services |
| Estimated Bid Value | $125,000.00 | ||||
Sign up free to see the agency name, 4 documents, contact info, and the original bid posting link.