RFQ: Purchase and Installation of Exhaust System for Bldg. 148 Dining Facility at Fort Allen

Estimated Value: $75,000
Open 14 days left PRConstructionsolicitation
Sep 3, 2026
Sep 17, 2026 8:00 PM
Construction
solicitation
238220
AI Summary
This bid is for the purchase and installation of a complete exhaust system for the dining facility in Building 148 at Fort Allen, including all necessary components and labor.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Commercial Kitchen Exhaust Hood System (Type I) 1 each $25,000.00 $25,000.00 Construction
Exhaust Fan (Upblast or Downblast, suitable for commercial kitchen) 1 each $5,000.00 $5,000.00 Construction
Ductwork and Fittings (Stainless Steel or Galvanized, as per code) 1 lot $10,000.00 $10,000.00 Construction
Fire Suppression System Integration (for exhaust hood) 1 each $7,500.00 $7,500.00 Construction
Make-up Air Unit (if required by code/design) 1 each $10,000.00 $10,000.00 Construction
Installation Labor (including demolition of existing system, if any) 1 lot $15,000.00 $15,000.00 Construction
Permits, Inspections, and Project Management 1 lot $2,500.00 $2,500.00 Professional Services
Estimated Bid Value$75,000.00

Want the full details?

Sign up free to see the agency name, 7 documents, contact info, and the original bid posting link.

📎 Solicitation_Amendment_W912LR26QA0410002_SF_30.pdf View
📎 Solicitation_W912LR26QA041-0002__Amended_.pdf View
📎 Solicitation_Amendment_W912LR26QA0410001_SF_30.pdf View
+4 more
Sign Up Free →

Related Bids

Browse More Bids

Construction BidsSOLICITATION BidsClosing Soon All Bids