J--Emergency Harbison Well Pump Replacement - ROMO

Estimated Value: $35,000
Open ColoradoFacilities & Maintenanceother
Sep 18, 2026
—
Facilities & Maintenance
other
238220
AI Summary
This bid is for the emergency replacement of a well pump at Rocky Mountain National Park's Harbison Well, including all necessary labor, materials, and equipment for installation and commissioning.
🏆 Who won similar work here

Most recent contracts from National Park Service under NAICS 238220, last 3 years. Typical award: $194K.

KOLMIST GROUP LLC$4,600Sep 2026E.o. 14398 backflow preventer inspections at gettysburg national military park and eisenh… details
ARK CONSTRUCTION MANAGEMENT LLC$213KSep 2026Eo 14398 national park service - independence national historical (inde) - interior finis… details
T WALLACE CONSULTING LLC$46KSep 2026Replace boiler at limantour lodge, point reyes national seashore, marin county, california details
QEVYX, LLC$249KSep 2026Replace hvac system at dewa locations details
JB CONTRACTING INC$194KSep 2026Eo 14398 national park service - independence national historical (inde) - chiller plant … details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Submersible Well Pump (e.g., Franklin Electric, Grundfos, or equivalent) 1 each $8,000.00 $8,000.00 Construction
Pump Installation Labor (including well pulling, setting, wiring, and testing) 40 hour $150.00 $6,000.00 Construction
Well Casing and Drop Pipe (replacement/repair as needed) 1 lot $3,000.00 $3,000.00 Construction
Electrical Wiring and Controls (replacement/repair as needed) 1 lot $2,500.00 $2,500.00 Construction
Crane/Hoisting Equipment Rental (for pump removal/installation) 1 day $1,500.00 $1,500.00 Construction
Mobilization and Demobilization (travel, setup, teardown) 1 lot $2,000.00 $2,000.00 Construction
Permits and Inspections (if required by local jurisdiction) 1 lot $500.00 $500.00 Professional Services
Project Management and Supervision 1 lot $3,000.00 $3,000.00 Professional Services
Contingency for unforeseen issues (e.g., well damage, additional parts) 1 lot $8,500.00 $8,500.00 Other
Estimated Bid Value$35,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 ROMO_Harbison_Well1_JOFOC_2026-09-16_1.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in ColoradoFacilities & Maintenance BidsClosing Soon All Bids