John Day Dam Powerhouse HVAC Upgrades

Estimated Value: $12,000,000
Open OregonConstructionsolicitation
Oct 1, 2026
—
Construction
solicitation
238220
small business
AI Summary
This bid is for comprehensive HVAC system upgrades at the John Day Dam Powerhouse, including the replacement and installation of chillers, pumps, piping, air handler units, and a new integrated digital control system, along with associated electrical and building modifications.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 238220, last 3 years. Typical award: $91K.

WILLIAMS DIVERSIFIED LLC$3,863Sep 2026Epg - semi annual clean agent inspection pop: 29 sept 2026 to 28 sept 2029 details
INSTALLATIEBEDRIJF EMBRECHTS B.V.$42KSep 2026Waterlines maintenance services, the netherlands details
INSTALLATIEBEDRIJF EMBRECHTS B.V.$91KSep 2026Final task order for hvac services for children and youth services (cys) joint forces com… details
QA ENGINEERING LLC$261KAug 2026Fy26 - 1047 boiler replacement. anticipated issuance of ntp is august 3, 2026anticipated… details
CHOICE SHEETMETAL LLC$214KAug 2026Non-uph preventive maintenance and repair services details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Primary and Secondary Chiller Systems (complete replacement and installation) 2 system $1,500,000.00 $3,000,000.00 Construction
Chiller Skid Packages (approximately 600 tons refrigeration capacity) 4 package $750,000.00 $3,000,000.00 Construction
Demolition and Removal of Existing HVAC System 1 lot $500,000.00 $500,000.00 Construction
New Electrical Feeds for HVAC Systems 1 lot $400,000.00 $400,000.00 Construction
Chilled Water Pumps (new installation) 1 lot $300,000.00 $300,000.00 Construction
Chilled Water Piping (new installation) 1 lot $600,000.00 $600,000.00 Construction
Air Handler Units (new installation) 1 lot $800,000.00 $800,000.00 Construction
Automated Digital HVAC Control System (new installation and integration) 1 system $1,000,000.00 $1,000,000.00 IT Software
Roof-Mounted Air-Cooled Condensers (installation, including roof penetrations and building modifications) 1 lot $700,000.00 $700,000.00 Construction
New Intake and Exhaust Ducting (fire prevention) 1 lot $400,000.00 $400,000.00 Construction
Fire Protection Measures at all Penetrations 1 lot $200,000.00 $200,000.00 Construction
Integrated Digital Control System for HVAC and Building Fire Protection (replacing pneumatic controls) 1 system $800,000.00 $800,000.00 IT Software
Mechanical and Controls Provisions for Free Cooling (passive outside air) 1 lot $200,000.00 $200,000.00 Construction
Modifications to Existing Intakes and Louvers 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$12,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in OregonConstruction BidsSOLICITATION BidsClosing Soon All Bids