Modification to 80KSC020C0013, Converter Compressor Facility (CCF), Phase 3

Estimated Value: $15,000,000
Open FloridaConstructionother
Oct 6, 2026
β€”
Construction
other
236210
AI Summary
This bid is for design-build construction services to modify the Converter Compressor Facility (CCF) at KSC, integrating a helium recovery system for Phase 3 to support NASA and commercial space operations.
πŸ† Who won similar work here

Most recent contracts from National Aeronautics and Space Administration under NAICS 236210, last 3 years. Typical award: $12M.

HITT CONTRACTING, INC.$22.9MOct 2026The renovation of the existing south wing of b13 at johnson space center. the existing b1… details
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC$8.4MOct 2026Revitalize pressure and propellants systems phase 3 details
MET-CON, INC.$12MOct 2026Craft labor and corrosion control at john f. kennedy space center (ksc), in support of th… details
ENERGY EPC SOLUTIONS, LLC$11.4MSep 2026Jsc wftca infrastructure improvements, replace failed ahus this project includes repla… details
HEALTHEON, INC$33.7MSep 2026Design-build construction consolidated laboratory facility at stennis space center details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-Build Construction Services for Converter Compressor Facility (CCF) Phase 3 Modifications 1 lot $15,000,000.00 $15,000,000.00 Construction
Integration of Planned Helium Recovery System for CCF Phase 3 1 lot β€” β€” Construction
Estimated Bid Value$15,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

πŸ“Ž JOFOC_CCF_P3_Redacted.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in FloridaConstruction BidsClosing Soon All Bids