Munitions Maintenance and Inspection Facility and Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI

Estimated Value: $28,000,000
Open 9 days left HawaiiConstructionsolicitation
Oct 7, 2026
Nov 12, 2026 2:00 PM
Construction
solicitation
236220
Small Business
AI Summary
This bid is for the construction of two concurrent projects at Joint Base Pearl Harbor-Hickam, Hawaii: a new Munitions Maintenance and Inspection Facility and an addition to the Conventional Munitions Cube Storage Facility.
πŸ† Who won similar work here

Most recent contracts from Department of the Army under NAICS 236220, last 3 years. Typical award: $13M.

FEDVET CONSTRUCTION$2,500Feb 2031Min guarantee details
DOYON TECHNICAL SERVICES, LLC$487KJul 2027Pj00082-25 - provide and install all material and labor necessary to demo failed cmp, and… details
CONTI FEDERAL SERVICES, LLC$44MJul 2027B-21 60 row south environmental protection shelters (eps) at ellsworth air force base (af… details
HOWARD W. PENCE, INC.$13MApr 2027Construction contract for in ang small indoor arms range details
J KOKOLAKIS CONTRACTING INC$24.1MFeb 2027Radial forge infrastructure at wva, ny details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Construction of Munitions Maintenance and Inspection Facility (KNMD209085) 1 lot $14,000,000.00 $14,000,000.00 Construction
Micro-pile Foundations for Munitions Maintenance and Inspection Facility 1 lot $1,500,000.00 $1,500,000.00 Construction
Cast-in-Place Concrete for Munitions Maintenance and Inspection Facility (slab-on-grade, walls, capping beams, masonry) 1 lot $2,000,000.00 $2,000,000.00 Construction
Structural Framing and Enclosure for Munitions Maintenance and Inspection Facility (cold-formed metal, insulated metal panels, structural steel) 1 lot $2,500,000.00 $2,500,000.00 Construction
Standing Seam Metal Roofing for Munitions Maintenance and Inspection Facility (gutters, downspouts, weather barrier) 1 lot $750,000.00 $750,000.00 Construction
Mechanical HVAC Systems for Munitions Maintenance and Inspection Facility (including 20-ton AC systems) 1 lot $1,200,000.00 $1,200,000.00 Construction
Interior Plumbing for Munitions Maintenance and Inspection Facility 1 lot $300,000.00 $300,000.00 Construction
Lightning/Grounding Protection for Munitions Maintenance and Inspection Facility 1 lot $200,000.00 $200,000.00 Construction
Communication Infrastructure for Munitions Maintenance and Inspection Facility 1 lot $400,000.00 $400,000.00 Construction
Fire Alarm-Mass Notification System for Munitions Maintenance and Inspection Facility 1 lot $600,000.00 $600,000.00 Construction
Wet-Pipe Sprinkler Suppression System for Munitions Maintenance and Inspection Facility 1 lot $500,000.00 $500,000.00 Construction
MAC Pad (Material Assembly Center) Concrete Pad (1,167 SY) 1167 SY $150.00 $175,050.00 Construction
Asphalt Pavement for MAC Pad Access and Egress 1 lot $100,000.00 $100,000.00 Construction
Construction of Conventional Munitions Cube Storage Addition (KNMD209086) 1 lot $14,000,000.00 $14,000,000.00 Construction
Micro-pile Foundations for Conventional Munitions Cube Storage Addition 1 lot $1,000,000.00 $1,000,000.00 Construction
Concrete Wall Structures for Conventional Munitions Cube Storage Addition (12 in. thick, high-hazard) 1 lot $3,000,000.00 $3,000,000.00 Construction
Cast-in-Place Concrete Slabs for Conventional Munitions Cube Storage Addition 1 lot $1,500,000.00 $1,500,000.00 Construction
Structural Steel Framing and Roof Joists for Conventional Munitions Cube Storage Addition 1 lot $2,000,000.00 $2,000,000.00 Construction
Standing Seam Metal Roofing for Conventional Munitions Cube Storage Addition 1 lot $600,000.00 $600,000.00 Construction
New Asphalt Pavement for Conventional Munitions Cube Storage Addition Access 1 lot $150,000.00 $150,000.00 Construction
Lightning and Grounding Protection Systems for Conventional Munitions Cube Storage Addition 1 lot $250,000.00 $250,000.00 Construction
Integrated Fire Detection and Alarm Reporting Systems for Conventional Munitions Cube Storage Addition 1 lot $700,000.00 $700,000.00 Construction
RAB Lighting Exterior Wall Packs (Applicable to both projects) 1 lot $50,000.00 $50,000.00 Facilities
Estimated Bid Value$28,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

πŸ“Ž PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in HawaiiConstruction BidsSOLICITATION BidsClosing Soon All Bids