Most recent contracts from Department of the Army under NAICS 237110, last 3 years. Typical award: $88K.
| THE CRAUN LIEBING COMPANY | $24K | Aug 2026 | Replace one submersible pump and one soft starter at the main lift station (id: #3) for t… details |
| M4 BUILDERS | $152K | Aug 2026 | Lift station repair details |
| INSITUFORM TECHNOLOGIES USA, LLC | $749K | Jul 2026 | Businesses that are interested in and capable of performing trench less sewer rehabilitat… details |
| PR PLUMBING, HEATING & AIR CONDITIONING, INC | $23K | Jul 2026 | Repair of sub-slab kitchen drainage pipe. details |
| J.S. MCCULLOUGH EXCAVATING LLC | $88K | Jul 2026 | Cagels mill main water line replacement details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Installation of new continuous backwash filtration system (replacing existing filter system) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Electrical improvements (upgrading PG&E service, new transformer, raceways, metering panel, new MCC, wiring, components) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Interconnection with pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Installation of new continuous backwash filter system (excavation, shoring, backfill for partially buried cast-in-place concrete tank with 3 filter cells, air control panel, grating, handrailing, inlet/outlet piping, valves, UV connection, power/control tie-ins) | 1 | lot | $1,750,000.00 | $1,750,000.00 | Construction |
| Construction of new masonry compressor building on concrete slab foundation (housing duplex air compressor, space for additional unit, refrigerated air dryer, oil-water separator, air filter) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Construction of new wet well and submersible pump station (buried precast wet well, adjacent valve vault, duplex submersible pump station, valves, appurtenances, piping, power control conduits) | 1 | lot | $1,250,000.00 | $1,250,000.00 | Construction |
| Demolition and disposal of existing adsorption clarifier and mixed media filter equipment | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Dewatering of sludge handling facility solids in 3 containerized, polymer-assisted gravity sludge dewatering systems (concrete pad, containment walls, drainage systems, quick coupler hose connections) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Yard pipe modifications to connect new components to existing WWTP (buried in native or engineered backfill) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Estimated Bid Value | $7,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.