| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| The District is requesting firm bid pricing for Towing Services on an as needed basis. Pricing shall include dispatch fee and all cost of preparation and towing. All prices quoted shall be considered fixed for the duration of the contract period. | — | — | |||
| Passenger (Small Vehicle) | — | — | |||
| 1 Ton+ (Large Vehicle) | — | — | |||
| 17 Passenger and 35 Passenger (Small Bus) | — | — | |||
| 77 Passenger (Large Bus) | — | — | |||
| Roadside assistance: Unlock vehicle | — | — | |||
| The District is requesting firm bid pricing for emergency Towing Services as needed after hours or on weekends. Pricing shall include dispatch fee and all cost of preparation and towing. All prices quoted shall be considered fixed for the duration of the contract period. | — | — | |||
| Passenger (Small Vehicle) | — | — | |||
| 1 Ton+ (Large Vehicle) | — | — | |||
| 17 Passenger and 35 Passenger (Small Bus) | — | — | |||
| 77 Passenger (Large Bus) | — | — | |||
| Roadside assistance: Unlock vehicle | — | — | |||
| Renewal Period One: The contract period shall commence on the date of award for a period of one year with an option to renew for two (2) additional one-year periods. Discounts shall remain firm for this period and shall include all freight and handling charges. All Increases and decreases will be calculated against the original contract discount, not against the previous year’s discount. The percentage indicated shall be used in the cost evaluation to determine the potential maximum financial liability to the District. Please state the percent change for the first renewal period. | — | — | |||
| Renewal Period Two: The contract period shall commence on the date of award for a period of one year with an option to renew for two (2) additional one-year periods. Discounts shall remain firm for this period and shall include all freight and handling charges. All Increases and decreases will be calculated against the original contract discount, not against the previous year’s discount. The percentage indicated shall be used in the cost evaluation to determine the potential maximum financial liability to the District. Please state the percent change for the second renewal period. | — | — | |||
| Estimated Bid Value | $15,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in