| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| ROOF REPAIR OF SINGLE PLY ROOFING Craftsman – Foreman, Regular Time | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING Craftsman – Foreman, Overtime | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- Laborer – Regular Time | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING Laborer– Overtime | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- 2- Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- 2-Man Crew – Overtime | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- 4-Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- 4-Man Crew - Overtime | — | — | |||
| ROOF REPAIR OF SINGLE PLY ROOFING- Material mark-up percentage | 1 | Percentage | — | — | |
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- Craftsman – Foreman, Regular Time | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- Craftsman – Foreman, Overtime | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- Laborer - Regular Time | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- Laborer – Overtime | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- 2-Man Crew - Regular Time | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- 2-Man Crew – Overtime | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- 4-Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- 4-Man Crew - Overtime | — | — | |||
| ROOF REPAIR OF MODIFIED BITUMEN ROOFING- Material mark-up percentage | 1 | Percentage | — | — | |
| ROOF REPAIR OF METAL ROOF- Craftsman – Foreman, Regular Time | — | — | |||
| ROOF REPAIR OF METAL ROOF- Craftsman – Foreman, Overtime | — | — | |||
| ROOF REPAIR OF METAL ROOF- Laborer - Regular Time | — | — | |||
| ROOF REPAIR OF METAL ROOF- Laborer – Overtime | — | — | |||
| ROOF REPAIR OF METAL ROOF- 2-Man Crew - Regular Time | — | — | |||
| ROOF REPAIR OF METAL ROOF- 2-Man Crew – Overtime | — | — | |||
| ROOF REPAIR OF METAL ROOF- 4-Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF METAL ROOF- 4-Man Crew - Overtime | — | — | |||
| ROOF REPAIR OF METAL ROOF- Material mark-up percentage | 1 | Percentage | — | — | |
| ROOF REPAIR OF SHINGLES- Craftsman – Foreman, Regular Time | — | — | |||
| ROOF REPAIR OF SHINGLES- Craftsman – Foreman, Overtime | — | — | |||
| ROOF REPAIR OF SHINGLES- Laborer - Regular Time | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- Laborer – Overtime | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- 2-Man Crew - Regular Time | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- 2-Man Crew – Overtime | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- 4-Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- 4-Man Crew - Overtime | — | — | |||
| ROOF REPAIR OF SHINGLE ROOFING- Material mark-up percentage | 1 | Percentage | — | — | |
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- Craftsman – Foreman, Regular Time | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- Craftsman – Foreman, Overtime | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- Laborer - Regular Time | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- Laborer – Overtime | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- 2-Man Crew - Regular Time | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- 2-Man Crew – Overtime | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- 4-Man Crew – Regular Time | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- 4-Man Crew - Overtime | — | — | |||
| ROOF REPAIR OF BUILT-UP MULTIPLY ROOFING- Material mark-up percentage | 1 | Percentage | — | — | |
| FLASHING REPAIR OF EXISTING THROUGH WALL FLASHING SYSTEM, INCLUDING 3 COURSE MINIMUM MASONRY REMOVAL AND REPLACEMENT IN EXISTING MASONRY WALL- Craftsman – Foreman, Regular Time | — | — | |||
| FLASHING REPAIR OF EXISTING THROUGH WALL FLASHING SYSTEM, INCLUDING 3 COURSE MINIMUM MASONRY REMOVAL AND REPLACEMENT IN EXISTING MASONRY WALL- Craftsman – Foreman, Overtime | — | — | |||
| FLASHING REPAIR OF EXISTING THROUGH WALL FLASHING SYSTEM, INCLUDING 3 COURSE MINIMUM MASONRY REMOVAL AND REPLACEMENT IN EXISTING MASONRY WALL- Laborer - Regular Time | — | — | |||
| FLASHING REPAIR OF EXISTING THROUGH WALL FLASHING SYSTEM, INCLUDING 3 COURSE MINIMUM MASONRY REMOVAL AND REPLACEMENT IN EXISTING MASONRY WALL- Laborer – Overtime | — | — | |||
| FLASHING REPAIR OF EXISTING THROUGH WALL FLASHING SYSTEM, INCLUDING 3 COURSE MINIMUM MASONRY REMOVAL AND REPLACEMENT IN EXISTING MASONRY WALL- 2-Man Crew - Regular Time | — | — | |||
| Estimated Bid Value | $500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in