Most recent contracts from Department of the Army under NAICS 237120, last 3 years. Typical award: $148K.
| KOREA ENGINEERING CONSULTANTS CORPORATION | $368K | Sep 2026 | 3rd option year w90vn9-23-d-0013 safety inspection, repair, and maintenance of natural ga… details |
| LK CONSTRUCTION CO., LTD. | $141K | Sep 2026 | Fuel tank inspection, testing, maintenance, and repair. details |
| GOSHAWK, LLC | $36.8M | Aug 2026 | Facilities 961 / 962 - (r) - includes all work for repairs and maintenance for both tanks… details |
| KOREA HOUSING MANAGEMENT CO.,LTD | $148K | Aug 2026 | The contractor shall provide materials, labor, equipment, and tools to replace domestic h… details |
| KOREA HOUSING MANAGEMENT CO.,LTD | $133K | Jul 2026 | Replacement of water storage tank for dhwh (b484), circulation pump for hwhb (b882), dhwh… details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| 100,000-barrel cut-and-cover JP-8 storage tank (steel with concrete outer wall and rolling cover) | 1 | each | $10,000,000.00 | $10,000,000.00 | Construction |
| Pump House (reinforced concrete construction with low slope concrete roof and built-up roofing) | 1 | each | $2,500,000.00 | $2,500,000.00 | Construction |
| 600-gpm issue vertical turbine pumps | 4 | each | $75,000.00 | $300,000.00 | Construction |
| 50-gpm water draw off vertical turbine pump | 1 | each | $30,000.00 | $30,000.00 | Construction |
| High-level valve for storage tank | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Independent level alarms for storage tank | 1 | set | $10,000.00 | $10,000.00 | Construction |
| Automatic Tank Gauging (ATG) system hardware for new tank | 1 | set | $50,000.00 | $50,000.00 | Construction |
| Piping, valves, vaults, and appurtenances connecting to existing filter separator building | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Control system integration for new tank with existing filter building PLC and HMI | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Automatic Tank Gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks | 1 | each | $150,000.00 | $150,000.00 | Construction |
| Product saver tank for new bulk storage tank | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Product recovery pump | 1 | each | $40,000.00 | $40,000.00 | Construction |
| Site adaptation and general construction services (excavation, foundations, electrical, HVAC, fire suppression, etc.) | 1 | lot | $7,500,000.00 | $7,500,000.00 | Construction |
| Estimated Bid Value | $25,000,000.00 | ||||