Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Estimated Value: $220,000
Closing Soon 3 days left MississippiManufacturingrfp
Oct 21, 2026
Nov 6, 2026 3:00 PM
Manufacturing
rfp
332311
small business
AI Summary
The U.S. Army Corps of Engineers is seeking quotes for the rehabilitation of the Arkabutla Lake Water Plant and the installation of a pre-fabricated metal building. This includes abandoning an old well, installing new plumbing and electrical systems, and constructing a 30'x50' metal building to protect a new well. The contract will be a Firm-Fixed Price awarded to a small business.
πŸ† Who won similar work here

Most recent contracts from Department of the Army under NAICS 332311, last 3 years. Typical award: $156K.

UH STRUCTURES INC$285KOct 2026Fy26 pn26101c dh-acp-grdbldgs (x2) fy26 oma funds are provided to acc/410csb/rco-miami to… details
MILL CREEK LLC$22.4MAug 2026Relocatable facility details
CXT INC$156KJul 2026Enid lake project office requires a contractor to provide all labor, tools, equipment, tr… details
RANDY ASHTON LLC$49KJul 2026S2p2: steel shed w911s226u3434 details
ISOBOX INC$90KJun 2026Mobile offices in support of panamax 2026 details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Abandonment of old well 1 each $5,000.00 $5,000.00 Construction
New plumbing system installation (including AWWA C-509 valves, AWWA flange fittings, Watts 2" pressure reducer, 2" flange master meter, Stenner model 45MHP10 chemical pump, 3 phase air compressor, accessories and fittings) 1 lot $30,000.00 $30,000.00 Construction
Pre-fabricated metal Red Iron open span building (30'x50', 12' tall eaves, 26-gauge roof & walls, 1 roll-up door, 1 3'x7' walk-through door, insulation, gutters, engineer's stamped drawings, anchor bolt plans) 1 each $75,000.00 $75,000.00 Construction
Sand blasting and painting of tank (1 coat Tnemec-Zinc 3-5ml inside/out, 2nd coat inside Tnemec series 21 6-9ml, 3rd coat inside Tnemec series 21 6-9ml, 2nd coat outside L140 epoxy 6-9ml, 3rd coat outside 1094 urethane 5-7ml) 1 each $40,000.00 $40,000.00 Construction
New electrical system installation (200-amp enclosed circuit breaker outside, 200-amp main breaker panel inside, pump control panel with motor starter, disconnect at well, 6x 8" LED strip lights, 2x 55 watt outside lights with photocell, 10x 120V outlets including outside GFCI, 3 phase circuit for air compressor, reconnect existing pressure controls) 1 lot $50,000.00 $50,000.00 Construction
Project Management, Supervision, Labor, Tools, and Equipment for installation 1 lot $20,000.00 $20,000.00 Professional Services
Estimated Bid Value$220,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 5 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

πŸ“Ž Scope_of_Work_Arkabutla_Lake_Water_Plant_Rehab_and_Pre-fabricated_Building_Installation.pdf View
πŸ“Ž Solicitation_W912EE27QA002.pdf View
πŸ“Ž Updated_Scope_of_Work_.docx View
+2 more