Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Estimated Value: $425,000
Open 20 days left MassachusettsConstructionrfi
Oct 21, 2026
Nov 23, 2026 12:00 PM
Construction
rfi
237990
8(a)
AI Summary
The U.S. Army Corps of Engineers is seeking information on capable small businesses to perform repairs to the float well pipe and replace staff gauges at Surry Mountain Dam. Interested firms should submit a capabilities package detailing their experience with specific project components, including pipe lining, CCTV inspections, and staff gauge installation. The project is estimated to cost between $350,000 and $500,000 and is planned for solicitation in Winter 2026 with construction in Summer 2027.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 237990, last 3 years. Typical award: $19.1M.

EMPIRE EQUIPMENT SERVICE, INC.$46.2MJul 2028Murrieta creek phase 2b details
MANSON CONSTRUCTION CO$13.3MFeb 2027Mississippi river, baton rouge to gulf, southwest pass hopper dredge contract nos. 1-2026 details
AGATE CONSTRUCTION COMPANY, INC.$53MNov 2026North jetty repairs, indian river inlet details
MARINEX CONSTRUCTION INC$19.1MSep 2026The scope of work includes the expansion of the cedar hammock range bend widener located … details
THE DUTRA GROUP$15.6MAug 2026Tampa harbor maintenance dredging egmont and mullet key cuts details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Coffer dam installation at inlet pipe location 1 lot $50,000.00 $50,000.00 Construction
Float well pipe (3-inch cast iron) cleaning 1 lot $20,000.00 $20,000.00 Construction
Installation of internal liner for float well pipe 1 lot $100,000.00 $100,000.00 Construction
Pre and Post liner installation CCTV inspections 2 each $10,000.00 $20,000.00 Construction
Repairs to the slash-zone pipe segment 1 lot $75,000.00 $75,000.00 Construction
Protection and concrete encasement of the external float well pipe 1 lot $100,000.00 $100,000.00 Construction
Staff Gauges: Pressure treated posts with attached enamel coated metal measuring strip 1 lot $60,000.00 $60,000.00 Construction
Estimated Bid Value$425,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in MassachusettsConstruction BidsRFI BidsClosing Soon All Bids