Justification for Other Than Full and Open Competition: Typhoon Bavi Additional Stone for Glass Breakwater, Apra Harbor, Guam

Estimated Value: $21,000,000
Open APConstructionother
Oct 22, 2026
—
Construction
other
237990
AI Summary
This is a justification for a sole-source contract modification to Tutor Perini Corporation-Nan Inc. A Joint Venture (TPC-NAN JV). The action is for emergency waterfront stabilization repairs to the Glass Breakwater at Apra Harbor, Guam, due to damage from Typhoon Bavi. It involves procuring and placing an additional 27,000 tons of armor stone to prevent further deterioration of critical infrastructure.
🏆 Who won similar work here

Most recent contracts from Department of the Navy under NAICS 237990, last 3 years. Typical award: $832K.

W E S T DEVELOPMENT, INC.$832KJul 2026Clear storm drain phase 3 and repair at b2499 details
REYES CONSTRUCTION, INC.$7.9MJul 2026Pe20e10m repair las pulgas landfill phase 1 and 2 liner; design bid build construction ma… details
TRACKS UNLIMITED, LLC$650KJul 2026Repair bent rail at switch 53a (nsa-m - navsup wss) details
EZ DOCKS UNLIMITED LLC$109KJul 2026Floating dock system specifications details
BALDI BROS. INCORPORATED$9.2MJul 2026Db1s0016 repair randsburg wash road details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Armor Stone (procurement and placement) 27000 ton $777.78 $21,000,000.00 Construction
Estimated Bid Value$21,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 JA_Typhoon_Bavi_Additional_Stone_Signed_Redacted.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsClosing Soon All Bids