Most recent contracts from Department of the Army under NAICS 238120, last 3 years. Typical award: $164K.
| JTG CORPORATION PTE. LTD. | $147K | Aug 2026 | Bill of materials for engineering civic action program in indonesia during ksatra warrior… details |
| CONSTRUCTION SOLUTIONS GROUP, LLC | $481K | Jul 2026 | Gull lake self-contained flush vault restroom installation and removal of existing vault … details |
| THE SMALL BRAND LLC | $12K | Jun 2026 | Repair building 254 mezzanine structure details |
| CAMERON CONSTRUCTION SERVICES LIMITED | $164K | Jun 2026 | Bill of material for tamiok strike 26 details |
| SINGHATHAI SUPPLY COMPANY LIMITED | $492K | Jan 2026 | Bill of materials for engineering civic action program in thailand during cobra gold 26 details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| On-site fabrication and final assembly of a three-bay, monolithic reinforced concrete High-Performance Magazine (HPM) structure | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Procurement, delivery, and installation of prefabricated reinforcing steel (rebar) into an integrated cage within formwork | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Procurement, receipt, placement, consolidation, finishing, and curing of ready-mix concrete | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Procurement, delivery, and installation of structural sand fill into designated wall cavities post-concrete | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Fabrication or procurement, on-site erection, bracing, and stripping of complete formwork system for walls, slabs, and doors | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| On-site formwork erection, rebar installation, and concrete placement for three separate reinforced concrete door components | 3 | each | $15,000.00 | $45,000.00 | Construction |
| Procurement and installation of all required embedded items (embeds, sleeves, plates) within formwork prior to concrete placement | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Mobilization of all materials and equipment to Fort Polk, LA | 1 | lot | $30,000.00 | $30,000.00 | Transportation |
| Estimated Bid Value | $750,000.00 | ||||