Mather Fueling System Repairs

Estimated Value: $315,000
Open 17 days left NebraskaConstructionsolicitation
Oct 22, 2026
Nov 20, 2026 2:00 PM
Construction
solicitation
237120
AI Summary
This solicitation is for comprehensive fueling system repairs and upgrades at Mather, CA. The project includes various physical installations and replacements such as sampling gauge hatches, mechanical gauges, collision barriers, catwalks, and alarms. It also involves drainage fixes, asphalt and concrete repairs, replacement of a POL building, installation of an ATG system, and relocation of a generator.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 237120, last 3 years. Typical award: $148K.

KOREA ENGINEERING CONSULTANTS CORPORATION$368KSep 20263rd option year w90vn9-23-d-0013 safety inspection, repair, and maintenance of natural ga… details
LK CONSTRUCTION CO., LTD.$141KSep 2026Fuel tank inspection, testing, maintenance, and repair. details
GOSHAWK, LLC$36.8MAug 2026Facilities 961 / 962 - (r) - includes all work for repairs and maintenance for both tanks… details
KOREA HOUSING MANAGEMENT CO.,LTD$148KAug 2026The contractor shall provide materials, labor, equipment, and tools to replace domestic h… details
KOREA HOUSING MANAGEMENT CO.,LTD$133KJul 2026Replacement of water storage tank for dhwh (b484), circulation pump for hwhb (b882), dhwh… details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Installation of sampling gauge hatch on manway 1 each $2,500.00 $2,500.00 Construction
Installation of clock type mechanical gauge on manway 1 each $2,000.00 $2,000.00 Construction
Recoating exterior of fuel storage tank 1 lot $30,000.00 $30,000.00 Facilities
Replacement of collision barriers 1 lot $10,000.00 $10,000.00 Construction
Addition of catwalk across entirety of tank 1 each $15,000.00 $15,000.00 Construction
Replacement of audible and visual alarms 1 lot $5,000.00 $5,000.00 Facilities
Repair of remote containment basin drainage issue 1 lot $7,500.00 $7,500.00 Construction
Replacement of asphalt on NE side of fueling facility 1 lot $20,000.00 $20,000.00 Construction
Repair of refueler parking concrete 1 lot $15,000.00 $15,000.00 Construction
Replacement of dispenser fuel monitor with non-coalescing filter and installation of water draw off system with hand pump 1 each $8,000.00 $8,000.00 Facilities
Replacement of asphalt near loading/unloading facility with concrete path 1 lot $25,000.00 $25,000.00 Construction
Replacement of POL building (same size and location) 1 each $100,000.00 $100,000.00 Construction
Supplying, installation, and testing of ATG system on AVGAS Fuel Storage Tank 1 each $40,000.00 $40,000.00 Facilities
Relocation of generator from compartmentalized area 1 each $15,000.00 $15,000.00 Construction
Estimated Bid Value$315,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 5 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 Solicitation_-_W9128F27RA045.pdf View
📎 27-R-A045-Specs.pdf View
📎 Davis_Bacon_Wage_Determinations_-_CA20260007.pdf View