| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Cured-in-place pipe (CIPP) lining for stormwater infrastructure rehabilitation | 1 | lot | $1,200,000.00 | $1,200,000.00 | Construction |
| Traffic control services (placement and removal of control devices) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Pre-construction and post-construction video inspection of stormwater pipes | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Bypass pumping services (as needed during rehabilitation) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Site preparation, restoration, and cleanup | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in