SR 11 at US 78 East Bound Ramp Intersection Improvements - KW Project No. 240294

Estimated Value: $1,500,000
Open 16 days left GeorgiaConstructionsolicitation
Oct 21, 2026
Nov 19, 2026 2:00 PM
Construction
solicitation
237310
AI Summary
The City of Monroe, GA is seeking bids for intersection improvements at SR 11 and the US 78 East Bound Ramp. The project involves widening the ramp, installing a new traffic signal, demolishing medians, milling and resurfacing asphalt, and adding striping and erosion control. Bids are due by November 19, 2026.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Roadway Widening (SR 11 at US 78 eastbound ramp) 1 lot $400,000.00 $400,000.00 Construction
Traffic Signal Installation (SR 11 and US 78 eastbound ramps intersection) 1 each $250,000.00 $250,000.00 Construction
Demolition of Existing Raised Medians 1 lot $50,000.00 $50,000.00 Construction
Milling and Resurfacing Asphalt 1 lot $300,000.00 $300,000.00 Construction
Striping and Road Markings 1 lot $75,000.00 $75,000.00 Construction
Erosion Control Measures 1 lot $100,000.00 $100,000.00 Construction
General Construction Services (Backfill, Digging, Ditching, Road Grading, Rock Stabilization) 1 lot $150,000.00 $150,000.00 Construction
Construction, Curb and Gutter (Including Maintenance, Repair, and Removal Services) 1 lot $100,000.00 $100,000.00 Construction
Project Management and Supervision 1 lot $75,000.00 $75,000.00 Professional Services
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in GeorgiaConstruction BidsSOLICITATION BidsClosing Soon All Bids