| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of 10' paved shared-use path | 1000 | linear feet | $150.00 | $150,000.00 | Construction |
| Connections to existing sidewalks | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Curb ramp installation | 4 | each | $5,000.00 | $20,000.00 | Construction |
| Path realignment at Jefferson St | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Crosswalk installation for path crossing | 1 | each | $25,000.00 | $25,000.00 | Construction |
| Site preparation and grading | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Traffic control and safety measures | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Estimated Bid Value | $300,000.00 | ||||