LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Estimated Value: $10,200,000
Open 30 days left NebraskaConstructionsolicitation
Oct 26, 2026
Dec 3, 2026 2:00 PM
Construction
solicitation
237990
AI Summary
This solicitation is for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project. The work involves stabilizing the shoreline of Lake Sharpe near Lower Brule, SD, through the construction of a riparian planting bench, a gravel path, and a riprap revetment. It also includes the creation of a new island which will form emergent wetland and riparian habitat. Key tasks include earth moving, grading, rock installation, and fill placement.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 237990, last 3 years. Typical award: $19.1M.

EMPIRE EQUIPMENT SERVICE, INC.$46.2MJul 2028Murrieta creek phase 2b details
MANSON CONSTRUCTION CO$13.3MFeb 2027Mississippi river, baton rouge to gulf, southwest pass hopper dredge contract nos. 1-2026 details
AGATE CONSTRUCTION COMPANY, INC.$53MNov 2026North jetty repairs, indian river inlet details
MARINEX CONSTRUCTION INC$19.1MSep 2026The scope of work includes the expansion of the cedar hammock range bend widener located … details
THE DUTRA GROUP$15.6MAug 2026Tampa harbor maintenance dredging egmont and mullet key cuts details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Riparian Planting Bench (100-foot wide) 1 lot $500,000.00 $500,000.00 Construction
Gravel Maintenance Path (entire reach) 1 lot $300,000.00 $300,000.00 Construction
Riprap Revetment (shoreline and island protection) 1 lot $2,000,000.00 $2,000,000.00 Construction
Island Construction (200x1500 ft, up to 3 ft deep water) 1 lot $5,000,000.00 $5,000,000.00 Construction
Earth Moving and Grading 1 lot $1,000,000.00 $1,000,000.00 Construction
Bank Shaping 1 lot $500,000.00 $500,000.00 Construction
Rock Installation 1 lot $500,000.00 $500,000.00 Construction
Water Management (during construction) 1 lot $200,000.00 $200,000.00 Construction
Fill Placement 1 lot $100,000.00 $100,000.00 Construction
Topsoil Placement 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$10,200,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 4 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

+1 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in NebraskaConstruction BidsSOLICITATION BidsClosing Soon All Bids