Most recent contracts from Department of Veterans Affairs under NAICS 236220, last 3 years. Typical award: $2.1M.
| LC FLUHARTY CONSTRUCTION LLC | $14.9M | Dec 2026 | Project 541-19-101 renovate operating room - vamc cleveland eo 14398 details |
| KMK CONSTRUCTION, INC | $1.5M | Nov 2026 | 631-26-012 transformer replacement. details |
| HIRT ELECTRIC, LLC | $244K | Nov 2026 | Hq guidance - commercial clauses for open market construction & a/e details |
| U.S. VET GENERAL CONTRACTING, LLC | $2.6M | Nov 2026 | Task order for facility condition improvements under the construction multiple award task⦠details |
| U.S. VET GENERAL CONTRACTING, LLC | $2.1M | Nov 2026 | Task order #13 for 3yr pmi under the construction multiple award task order contract (mat⦠details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Installation of Transient Voltage Surge Suppression (TVSS) devices at main service panel | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Establishment of equipotential bonding for electrical, communication, piping, and structural steel systems at service entrance | 1 | lot | $12,000.00 | $12,000.00 | Construction |
| Repair of detached or pulled away roof air terminals (estimated 10-20 terminals) | 15 | each | $300.00 | $4,500.00 | Construction |
| Installation of new air terminals at both ends of each screen wall, plus 20-foot intervals along top (estimated 10-20 terminals) | 15 | each | $400.00 | $6,000.00 | Construction |
| Installation of new air terminals at highest point of HVAC ductwork (estimated 2-4 terminals) | 3 | each | $400.00 | $1,200.00 | Construction |
| Installation of new air terminals at each corner of new HVAC equipment (estimated 4-8 terminals) | 6 | each | $400.00 | $2,400.00 | Construction |
| Connection of newly installed air terminals to existing LPS using #2 bare copper conductors | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| Qualified inspection to verify compliance with NFPA 780 and UL 96A standards | 1 | each | $2,500.00 | $2,500.00 | Professional Services |
| Issuance of Master Label Certificate for lightning protection system | 1 | each | $500.00 | $500.00 | Professional Services |
| Project Management, Supervision, Labor, Equipment, Materials, Supplies, Tools (120-day project) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Demolition work, negative pressure environment, safety submittals, material selection submittals | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Estimated Bid Value | $115,000.00 | ||||