Most recent contracts from Department of the Army under NAICS 238210, last 3 years. Typical award: $31K.
| ALL DOOR SYSTEMS & SERVICES | $150K | Sep 2026 | Op3, overhead and automatic doors, service, aps-2 zutendaal and chievres air base, belgium details |
| CORNET TECHNOLOGY, INC. | $31K | Sep 2026 | Cornet radio maintenance and training details |
| PREDICTIVE TECHNOLOGIES INC. | $20K | Jul 2026 | 400hz converter inspection to oy3 details |
| SAWYER SERVICES INC | $20K | Jul 2026 | Replace damage transformer iaw sow details |
| REMEDY TECHNOLOGICAL SERVICES, LP | $149K | Jul 2026 | Contractor job reference: job 26050 - otc exec cr and ccr av upgrades details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing 500 kVA, 13.8 kV/480V station service transformer | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Removal of existing 15 kV switchgear and breakers located beneath control room | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Removal of 480V station service switchgear in control room | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Removal of the existing 15kV cables to the switchyard | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Removal of existing potheads for the 15kV cable transition to switchyard bus | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Installation of new 15kV cables to the switchyard | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Installation of new potheads for the 15kV cable transition to switchyard bus | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Installation of new cable trays containing the new 15kV cables in cable tunnel | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Installation of front accessible double-ended 480V switchgear beneath control room with feeder circuit breakers | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA 13.8kV/480V, high-resistance grounded wye station service transformers | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding resistor | 1 | each | $150,000.00 | $150,000.00 | Construction |
| New control and annunciation wiring for new 480V and 15kV switchgear | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Modifications to protective relay settings and new protection relays for the new station service feeders | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc flash mitigation switches | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Replacement and relocation of existing Lighting Transformer | 1 | each | $50,000.00 | $50,000.00 | Construction |
| Project Management, Engineering, and General Construction Services for 15kV Switchgear & Station Service Replacement | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Estimated Bid Value | $7,500,000.00 | ||||