Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Estimated Value: $75,000
Open 8 days left Constructionrfi
Oct 27, 2026
Nov 11, 2026 7:00 PM
Construction
rfi
237110
Small Business
AI Summary
This is a sources sought notice for market research regarding the replacement of a lateral water line and associated facilities for a wastewater system in Napa County, California. The Bureau of Reclamation is seeking information from small businesses interested in performing this work, which includes valve replacements, pipe installation, and pressure reducing valve systems. The government will use this information for acquisition planning and may decide to set aside the future solicitation for small businesses.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
2" gate lateral valve rated for 200 psi 1 each $300.00 $300.00 Construction
N30 utility valve box with water on lid 1 each $150.00 $150.00 Construction
Risers to surface grade for N30 utility valve box 1 lot $50.00 $50.00 Construction
1" lateral water line from main line 2" valve to PRV and 1" gate valve at rear of C.S. at Chase room 1 lot $5,000.00 $5,000.00 Construction
1" pressure reducing valve (PRV) 2 each $250.00 $500.00 Construction
1" gate valve rated for 200 psi 2 each $100.00 $200.00 Construction
N30 utility valve box with water on lid for 1" PRV and gate valve 1 each $150.00 $150.00 Construction
Risers to surface grade for N30 utility valve box (1" PRV and gate valve) 1 lot $50.00 $50.00 Construction
Drilling holes in brick on each side of C.S. Chase room access door 2 each $100.00 $200.00 Construction
1" galvanized pipe from exterior PRV/gate valve, split into 2 lines, and run pipe in each hole to near interior copper line connection point 1 lot $1,000.00 $1,000.00 Construction
Concrete for filling wall holes 1 lot $50.00 $50.00 Construction
Interior PRV 1 each $250.00 $250.00 Construction
Interior 1" gate valve 1 each $100.00 $100.00 Construction
Tee with pressure gauge (1" face 0 to 60 psi) 1 each $75.00 $75.00 Construction
Connection to copper pipe on each side of Chase room 1 lot $500.00 $500.00 Construction
Flushing of system 1 lot $200.00 $200.00 Construction
Labor and equipment for installation of all components 1 lot $65,000.00 $65,000.00 Construction
Estimated Bid Value$75,000.00

Want the full details?

Sign up free to see the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsRFI BidsClosing Soon All Bids