| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Mixed hardwood tree cutting and removal | 275 | trees | $500.00 | $137,500.00 | Construction |
| Trail widening, aggregate subgrade, and bituminous concrete paving (8' width) | 8200 | linear feet | $150.00 | $1,230,000.00 | Construction |
| Single span steel pedestrian bridge construction (60' length, 10' clear width) with stone-faced abutments | 1 | each | $400,000.00 | $400,000.00 | Construction |
| Integrally colored concrete multi-use recreational plaza construction (2800 SF) with stone seating walls and wooden benches | 1 | each | $350,000.00 | $350,000.00 | Construction |
| Riverbank erosion control utilizing bioengineered fill structure with locally harvested vegetation | 200 | linear feet | $750.00 | $150,000.00 | Construction |
| Spur trail construction (earth cuts and fills) to connect to Saunooke Bridge | 250 | linear feet | $900.00 | $225,000.00 | Construction |
| Estimated Bid Value | $2,500,000.00 | ||||
Sign up free to see the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.