| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing asphalt shingle roofing system, underlayment, sheet metal flashing and trim | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Removal of existing wall panels, sheet metal trim and building paper at dormer locations | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Removal of existing fiberglass panel windows at dormer locations | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Removal and replacement of portions of plywood sheathing and decking | 1 | unit price basis | $50,000.00 | $50,000.00 | Construction |
| Installation of new asphalt shingle roofing system and associated underlayment | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Installation of new sheet metal flashing, gutters, and downspouts | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Installation of new fiber-cement panel siding with extruded aluminum trim at dormer walls, including air barrier membranes and flashing | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Installation of new fiberglass panel windows at existing dormer openings, including associated sheet metal and membrane flashing | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Temporary protection, shoring, and site access coordination | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Disposal of demolished materials, dirt, and debris off-site | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Clean and restore all areas impacted by the work | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Estimated Bid Value | $1,200,000.00 | ||||