Most recent contracts from Department of the Navy under NAICS 221122, last 3 years. Typical award: $82K.
| HOSEI CO., LTD. | $34K | Jun 2026 | Repair no.3 electrical feeder cable, hario housing area details |
| K5 DEFENSE LLC | $82K | Jun 2026 | Nuc stud heater cart details |
| PHAETON SOLUTIONS LLC | $360K | May 2026 | Modular power distribution units (pdus) details |
| PUGET SOUND ENERGY INC | $555K | May 2026 | Utility design coordination and connection details |
| DYNAPOWER COMPANY LLC | $58K | Apr 2026 | (msf) magnetic silencing facility maintenance details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Recapitalization of Navy High Voltage 230kV Transmission Loop | 1 | project | $50,000,000.00 | $50,000,000.00 | Construction |
| Ancillary Equipment and Gear for 230kV Transmission Loop | 1 | lot | $15,000,000.00 | $15,000,000.00 | Construction |
| Utility Infrastructure Upgrades and Connection Facilities | 1 | project | $10,000,000.00 | $10,000,000.00 | Construction |
| Cybersecurity Hardening of Transmission Line and Associated Gear | 1 | project | $7,500,000.00 | $7,500,000.00 | IT Services |
| Relocation of High Power Loop and Crossing Tower across North River | 1 | project | $12,000,000.00 | $12,000,000.00 | Construction |
| Replacement of Conductors along Primary Transmission Corridor | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Modernization of Substation Digital Protective Relays (Utility-Grade Devices) | 3 | substation | $1,500,000.00 | $4,500,000.00 | IT Hardware |
| Implementation of Secure, Encrypted Supervisory Control and Data Acquisition (SCADA) System | 1 | system | $6,000,000.00 | $6,000,000.00 | IT Software |
| Secure Communications Gateway for SCADA System | 1 | gateway | $1,500,000.00 | $1,500,000.00 | IT Hardware |
| Replacement of Closed Circuit Television Metering Transformers with Fault Monitoring Capability | 1 | lot | $2,000,000.00 | $2,000,000.00 | Energy |
| Replacement of Porcelain Insulators | 1 | lot | $1,000,000.00 | $1,000,000.00 | Energy |
| Replacement of High-Voltage Bushings | 1 | lot | $1,000,000.00 | $1,000,000.00 | Energy |
| Replacement of Surge Arrestors | 1 | lot | $750,000.00 | $750,000.00 | Energy |
| Replacement of Ground-Grid Bonding Systems | 1 | lot | $750,000.00 | $750,000.00 | Energy |
| Removal of Manual/Gang-Operated Air Disconnect Switches (Substations 1-3) | 3 | substation | $250,000.00 | $750,000.00 | Construction |
| Installation of Smart Supervisory-Controlled Motor-Operated Disconnects | 1 | lot | $2,500,000.00 | $2,500,000.00 | Energy |
| Installation of Vacuum or SF6 Circuit Breakers with High-Speed Differential Bus and Transformer Protection Schemes | 1 | lot | $3,000,000.00 | $3,000,000.00 | Energy |
| Estimated Bid Value | $125,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.