| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-Build Services for Major Maintenance and Repair of UPH Building 127 | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Renovation of 32 single-space UPH rooms | 32 | room | $25,000.00 | $800,000.00 | Construction |
| Renovation of 6 double-space UPH suites | 6 | suite | $40,000.00 | $240,000.00 | Construction |
| New flooring installation | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Bathroom tile installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Vanities installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Fans installation | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Light fixtures installation | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Interior paint application | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Tub-to-shower conversions | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Replacement of aging galley equipment | 1 | lot | $100,000.00 | $100,000.00 | Facilities |
| Replacement of galley lay-in ceiling | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Renovation of men’s and women’s locker rooms | 1 | lot | $120,000.00 | $120,000.00 | Construction |
| Repair and repainting of the building exterior | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Repair and repainting of interior stairwells and hallways | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| Upgrades to damaged finishes in the multi-purpose room | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Full assessment and redesign of dedicated air system | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Replacement of HVAC equipment | 1 | lot | $300,000.00 | $300,000.00 | Facilities |
| Recalculation of cooling loads | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Redesign of HVAC system for proper environmental control | 1 | lot | $40,000.00 | $40,000.00 | Professional Services |
| Installation of motion-sensor and infrared-sensing PTAC thermostats | 38 | each | $500.00 | $19,000.00 | Facilities |
| Installation of electronic key card system | 1 | lot | $75,000.00 | $75,000.00 | Security |
| Repair Storm Sewer Lines | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $3,000,000.00 | ||||
Sign up free to see the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in