Justification for Other Than Full and Open Competition: Typhoon Sinlaku Additional Stone for Glass Breakwater, Apra Harbor, Guam

Estimated Value: $19,624,552
Open APConstructionother
Oct 30, 2026
—
Construction
other
237990
AI Summary
This is a justification for a sole-source contract modification to Tutor Perini Corporation-Nan Inc. A Joint Venture (TPC-NAN JV) for emergency repairs to the Glass Breakwater at Apra Harbor, Guam. The repairs are needed due to damage from Typhoon Sinlaku and involve procuring and placing additional armor stone to prevent further deterioration of critical infrastructure. The urgency of the situation prevents a full and open competition.
🏆 Who won similar work here

Most recent contracts from Department of the Navy under NAICS 237990, last 3 years. Typical award: $832K.

W E S T DEVELOPMENT, INC.$832KJul 2026Clear storm drain phase 3 and repair at b2499 details
REYES CONSTRUCTION, INC.$7.9MJul 2026Pe20e10m repair las pulgas landfill phase 1 and 2 liner; design bid build construction ma… details
TRACKS UNLIMITED, LLC$650KJul 2026Repair bent rail at switch 53a (nsa-m - navsup wss) details
EZ DOCKS UNLIMITED LLC$109KJul 2026Floating dock system specifications details
BALDI BROS. INCORPORATED$9.2MJul 2026Db1s0016 repair randsburg wash road details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Procurement and placement of additional armor stone for Glass Breakwater repair 1 lot $19,624,552.00 $19,624,552.00 Construction
Estimated Bid Value$19,624,552.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 JA_Typhoon_Sinlaku_Additional_Stone_Redacted.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsClosing Soon All Bids