| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition and removal of existing buildings, utilities, pavement, and other structures (Phase 1 & 2) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Identification, handling, abatement, removal, transportation, and lawful disposal of asbestos-containing materials (ACM) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Identification, handling, abatement, removal, transportation, and lawful disposal of lead-containing materials | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Identification, handling, abatement, removal, transportation, and lawful disposal of hazardous coatings and other regulated substances | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Installation and maintenance of erosion and sedimentation control measures | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Clearing and grubbing of vegetation within designated disturbance limits (approx. 3.30 acres) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Demolition debris removal and disposal | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Temporary stabilization of the site | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Estimated Bid Value | $7,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in