Most recent contracts from Department of the Army under NAICS 236220, last 3 years. Typical award: $13M.
| FEDVET CONSTRUCTION | $2,500 | Feb 2031 | Min guarantee details |
| DOYON TECHNICAL SERVICES, LLC | $487K | Jul 2027 | Pj00082-25 - provide and install all material and labor necessary to demo failed cmp, and⦠details |
| CONTI FEDERAL SERVICES, LLC | $44M | Jul 2027 | B-21 60 row south environmental protection shelters (eps) at ellsworth air force base (af⦠details |
| HOWARD W. PENCE, INC. | $13M | Apr 2027 | Construction contract for in ang small indoor arms range details |
| J KOKOLAKIS CONTRACTING INC | $24.1M | Feb 2027 | Radial forge infrastructure at wva, ny details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Progressive Design-Build Services for 26,000 SF Hangar | 1 | lot | $5,000,000.00 | $5,000,000.00 | Professional Services |
| Construction of 25,172 SF Steel-Frame Hangar Facility | 1 | each | $25,000,000.00 | $25,000,000.00 | Construction |
| Design, Build, and Certification of ICD 705 Secure Rooms | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Fully Climate-Controlled Maintenance and Testing Bay | 1 | each | $2,000,000.00 | $2,000,000.00 | Construction |
| Maintenance Workshop Construction | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Logistics Warehouses (2 units) | 2 | each | $750,000.00 | $1,500,000.00 | Construction |
| Payloads Storage Room Construction | 1 | each | $400,000.00 | $400,000.00 | Construction |
| Security Office Construction | 1 | each | $300,000.00 | $300,000.00 | Construction |
| Personnel Support Space Construction | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| High-Performance and Sustainable Building Design Features | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| 750 kW Standby Generator Installation | 1 | each | $750,000.00 | $750,000.00 | Facilities |
| Primary and Secondary Electrical Distribution Systems (including transformers) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Facilities |
| Apron Lighting Installation | 1 | lot | $300,000.00 | $300,000.00 | Facilities |
| Exterior Security Lighting Installation | 1 | lot | $200,000.00 | $200,000.00 | Security |
| Telecommunications Infrastructure and Secure Communications Lines Integration | 1 | lot | $1,500,000.00 | $1,500,000.00 | Telecommunications |
| Fully Climate-Controlled HVAC System for Hangar and Support Areas | 1 | lot | $3,000,000.00 | $3,000,000.00 | Facilities |
| Potable Water Line Installation | 1 | lot | $400,000.00 | $400,000.00 | Facilities |
| Sanitary Sewer Line Installation | 1 | lot | $500,000.00 | $500,000.00 | Facilities |
| Natural Gas Piping Installation | 1 | lot | $300,000.00 | $300,000.00 | Facilities |
| Dedicated Fire Suppression System Installation | 1 | lot | $1,000,000.00 | $1,000,000.00 | Facilities |
| System Commissioning, Cybersecurity Feature Testing, and Operational Validation | 1 | lot | $1,200,000.00 | $1,200,000.00 | Professional Services |
| Operations and Maintenance Support Information (OMSI) Technical Manuals Development | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Post Construction Award Services (PCAS) | 1 | lot | $750,000.00 | $750,000.00 | Professional Services |
| Site Clearing, Excavation, and Preparation (including 10,000 CY earthwork) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Storm Water Management Facility with Low Impact Development (LID) Elements | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Structural Steel-Frame Building Super-Structure with Built-Up Roofing | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Spread Footing Reinforced Concrete Foundation | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Fixed-Wing Taxiway Construction | 1 | each | $4,000,000.00 | $4,000,000.00 | Construction |
| Rotary-Wing Parking Apron Construction | 1 | each | $2,000,000.00 | $2,000,000.00 | Construction |
| Hangar Access Apron Construction | 1 | each | $1,500,000.00 | $1,500,000.00 | Construction |
| Organizational Vehicle Parking Construction | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Concrete and Asphalt Access Roads, Curbs, Grading, and Sidewalks | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Utility Connections, Interfaces, and Cutover Work | 1 | lot | $2,000,000.00 | $2,000,000.00 | Facilities |
| Estimated Bid Value | $75,000,000.00 | ||||