| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-Build HVAC Services for Floor #2 Renovation | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| VAV (Variable Air Volume) Box Replacement | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Hot Water Coil Replacement | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Control Damper Replacement | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| DDC (Direct Digital Control) System Upgrade for Ground Floor AHUs | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Hot Water Piping Installation (from building riser to VAVs) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Grilles, Outside Air Dampers, and Actuators Installation | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Fire Damper Installation and Accessories | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Air Handler Upgrade from Starters to VFDs (Variable Frequency Drives) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Extended Outdoor Boiler Flue Installation | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Ceiling Grid and Tile Removal and Replacement | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Estimated Bid Value | $1,250,000.00 | ||||