Most recent contracts from Department of the Army under NAICS 336611, last 3 years. Typical award: $285K.
| CONRAD SHIPYARD, L.L.C | $24.2M | Jul 2026 | 3315 mvk crane barge details |
| DERECKTOR FLORIDA, INC. | $9.1M | Jul 2026 | 3228 swg hydrographic survey boat details |
| BIG RIVER SALVAGE AND CONSTRUCTION, INC | $77K | Jul 2026 | The revetment branch of the usace vicksburg district requires welding and crane support t… details |
| PROPULSION SYSTEMS, INC. | $173K | Jul 2026 | Usace, portland district requires a services contract to modify the dredge essayons 1 por… details |
| SHEARWATER MARINE FL, INC. | $285K | Jul 2026 | Small marine craft maintenance and repair details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Barge transport (pickup from Lock and Dam 7 to contractor facility) | 1 | lot | $25,000.00 | $25,000.00 | Transportation |
| Drydocking services (raise vessel, inspection access) | 1 | lot | $50,000.00 | $50,000.00 | Facilities |
| Pressure blasting of hull | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Thorough hull inspection | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Complete removal and replacement of timber/wood decking (110 ft x 26 ft) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Spud repositioning and fabrication/installation of new spud wells | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Moving existing winches to new positions | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Replacing wire rope for winches | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Re-routing three-phase 480-volt power to winches | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Painting the hull (after pressure blasting) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Extending/replacing 30 ft spuds to 40 ft spuds (quantity assumed 2-4) | 3 | each | $40,000.00 | $120,000.00 | Construction |
| Preparation of estimates for out-of-scope repairs | 1 | lot | $5,000.00 | $5,000.00 | Professional Services |
| Barge transport (return to Lock and Dam 7 from contractor facility) | 1 | lot | $25,000.00 | $25,000.00 | Transportation |
| Project Management and Overhead (estimated 30% of direct costs) | 1 | lot | $550,000.00 | $550,000.00 | Professional Services |
| Estimated Bid Value | $1,250,000.00 | ||||