Robert A. Skinner Water Treatment Plant Fire Alarm Control Panels Replacement (2129A)

Estimated Value: $150,000
Open New 44 days left CaliforniaConstructionsolicitation
Nov 3, 2026
Dec 17, 2026 2:00 PM
Construction
solicitation
238210
AI Summary
The Metropolitan Water District of Southern California is seeking bids for the replacement of fire alarm control panels at the Robert A. Skinner Water Treatment Plant. Interested parties must submit their bids electronically by the specified deadline. The solicitation requires a bid bond and lists several categories related to fire protection and safety equipment.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Fire Alarm Control Panels (FACP) - Main System 1 system $50,000.00 $50,000.00 Security
Fire Alarm Control Panels (FACP) - Auxiliary/Sub-panels 2 each $15,000.00 $30,000.00 Security
Fire Alarm System Installation Services 1 lot $50,000.00 $50,000.00 Construction
Fire Alarm System Testing and Commissioning 1 lot $10,000.00 $10,000.00 Professional Services
Fire Alarm System Programming and Configuration 1 lot $10,000.00 $10,000.00 Professional Services
Estimated Bid Value$150,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in CaliforniaConstruction BidsSOLICITATION BidsClosing Soon All Bids