Responses are due November 9, 2026 at 10:00 AM (local agency time). That is 3 days from today.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 237990 (Construction).
Government bid in the Construction category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Large Module Assemblies (MAs) replacement | 18 | each | $1,500.00 | $27,000.00 | Construction |
| Small Module Assemblies (MAs) replacement (open well style with standard) | 40 | each | $800.00 | $32,000.00 | Construction |
| Keel Deflection System (KDS) replacement | 9 | each | $2,000.00 | $18,000.00 | Construction |
| Pontoon straps and hardware (36" lifting eyes) replacement | 9 | lot | $1,000.00 | $9,000.00 | Construction |
| Structural support beams and pontoon guide beams replacement | 45 | each | $1,200.00 | $54,000.00 | Construction |
| Cathodic protection system installation on beams | 45 | each | $500.00 | $22,500.00 | Construction |
| Powerhead valves and wiring replacement (standard valves and wires) | 9 | each | $700.00 | $6,300.00 | Construction |
| Freshwater washdown hoses (40 ft length) installation | 18 | each | $300.00 | $5,400.00 | Construction |
| Protection system installation between MAs and piling | 9 | each | $400.00 | $3,600.00 | Construction |
| Bunk tusk system installation | 9 | each | $600.00 | $5,400.00 | Construction |
| Dock stern rebuild with intermediate corrugation support | 9 | each | $3,000.00 | $27,000.00 | Construction |
| Damaged pontoons replacement | 6 | each | $2,500.00 | $15,000.00 | Construction |
| Additional large Module Assemblies (MAs) for 29 ft RB-S II boats | 30 | each | $1,500.00 | $45,000.00 | Construction |
| Additional small Module Assemblies (MAs) for 29 ft RB-S II boats | 5 | each | $800.00 | $4,000.00 | Construction |
| New inner bunk systems installation for various boats | 9 | lot | $5,000.00 | $45,000.00 | Construction |
| Pontoon calibration for various boats | 9 | lot | $2,000.00 | $18,000.00 | Construction |
| Labor and equipment for dock repair and installation (general) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $387,000.00 | ||||
Sign up free to see the original bid posting link, plus the 3 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.