Responses are due November 19, 2026 at 5:30 PM (local agency time). That is 13 days from today.
New Mexico. It is listed with other open New Mexico government bids on BidsNexus.
The notice sets this opportunity aside for small business businesses. Confirm eligibility in the solicitation documents.
NAICS 237130 (Construction).
Request for Information (RFI) in the Construction category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
Most recent contracts from Department of the Air Force under NAICS 237130, last 3 years. Typical award: $159K.
| TELEFONICA DE ESPANA SAU | $18K | Jul 2026 | The contractor shall provide all personnel, equipment, tools, vehicles, materials, superv… details |
| CARVERBETH, LLC | $1.9M | Jul 2026 | Fiber optic boring installation details |
| VETERANS LIGHTING, INC. | $159K | Jun 2026 | Provide all equipment and labor to install fiber optic cabling between buildings 475 to 2… details |
| VETERANS LIGHTING, INC. | $205K | Jun 2026 | Provide all equipment and labor to install fiber optic cabling between buildings 870 to 4… details |
| VETERANS LIGHTING, INC. | $151K | Jun 2026 | Provide all equipment and labor to install fiber optic cabling between buildings 475 to 5… details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Progressive Design-Build (PDB) Services for Substation 9 and Feeders Upgrade | 1 | project | $50,000,000.00 | $50,000,000.00 | Construction |
| Demolition and Removal of Existing Substation 9 Infrastructure | 1 | project | $1,000,000.00 | $1,000,000.00 | Construction |
| Design and Construction of New Substation Facility (100ft x 150ft footprint) for Substation 9 | 1 | project | $20,000,000.00 | $20,000,000.00 | Construction |
| Installation of New Substation Components for Substation 9 | 1 | lot | $15,000,000.00 | $15,000,000.00 | Construction |
| Installation of Security Fencing for Substation 9 | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Installation of Distribution Poles for Substation 9 | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Installation of Switching Gear for Substation 9 | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Installation of Conductors for Substation 9 | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Progressive Design-Build (PDB) Services for Removal of Substation 23 & Connection to Substation 24A Feeder 5 | 1 | project | $30,000,000.00 | $30,000,000.00 | Construction |
| Demolition and Removal of Substation 23 | 1 | project | $750,000.00 | $750,000.00 | Construction |
| Design and Construction Services to Connect Loads to Substation 24A Feeder 5 | 1 | project | $25,000,000.00 | $25,000,000.00 | Construction |
| Upgrade of Existing Infrastructure for Substation 24A Feeder 5 | 1 | project | $4,000,000.00 | $4,000,000.00 | Construction |
| Progressive Design-Build (PDB) Services for Demolition of Substation 3, Rebuild of Substation 10 and Distribution System | 1 | project | $70,000,000.00 | $70,000,000.00 | Construction |
| Decommissioning and Demolition of Substation 3 | 1 | project | $1,000,000.00 | $1,000,000.00 | Construction |
| Decommissioning and Demolition of Existing Substation 10 | 1 | project | $1,000,000.00 | $1,000,000.00 | Construction |
| Design, Construction, and Commissioning of Modern, Consolidated Substation 10 (10,000 KVA / 10/12/14 MVA rated) | 1 | project | $40,000,000.00 | $40,000,000.00 | Construction |
| Design and Construction of Underground Distribution Backbone for Substation 10 | 1 | project | $25,000,000.00 | $25,000,000.00 | Construction |
| Technical Redesign Requirements for Electrical Systems | 1 | lot | $5,000,000.00 | $5,000,000.00 | Professional Services |
| New 12.47 kV Distribution Systems Installation | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Estimated Bid Value | $150,000,000.00 | ||||